Loading…

Airedale by Modine acquired a 14.6-acre site in Bradford, UK, to expand manufacturing of data centre cooling systems. The site will add 29,000 sq m of space and is expected to become operational in December 2024, creating over 200 jobs.
“Airedale by Modine will be expanding its manufacturing capabilities for IT cooling systems with the acquisition of a new 14.6 acre production site in England.”racplus.com
Summarized from public sources; check the original articles before acting on it.