Loading…

Tennessee Valley Authority has ordered 16 aeroderivative LM6000VELOX gas turbine and generator packages from GE Vernova for a 1.5-GW complex replacing the Kingston Fossil Plant. The units are expected to begin operating in 2028.
“GE Vernova has bagged the Tennessee Valley Authority’s (TVA’s) first order as part of a fast-track project to replace the 1.3-GW Kingston Fossil Plant.”powermag.com
Summarized from public sources; check the original articles before acting on it.