Loading…
Metso has been contracted to deliver a new copper smelter to Almalyk MMC in Uzbekistan, with a planned production capacity of 300,000 tonnes per year of copper cathodes and 1.8 million tonnes per year of sulphuric acid.
“The planned production capacity of the new copper smelter is 300,000 r/y of copper cathodes and 1.8 million t/y of sulphuric acid.”mining.com
Summarized from public sources; check the original articles before acting on it.