Loading…

EcoPro subsidiary EcoPro HN signed a contract with EcoPro Materials for the supply and installation of a wastewater treatment plant worth 104.5 billion KRW. The contract runs from March 29, 2024 to June 30, 2025.
“EcoPro subsidiary EcoPro HN announced on the 1st that it has signed a contract for the supply and installation of a wastewater treatment plant with EcoPro Materials.”asiae.co.kr
Summarized from public sources; check the original articles before acting on it.