Loading…
KSB will supply MegaCPK chemical pumps and SISTO-RSK check valves for a 24 MW green hydrogen electrolysis plant under construction in Porsgrunn, Norway, for a German engineering contractor, with delivery by the end of 2022.
“By the end of 2022, the KSB Group will have supplied pumps and valves for an electrolysis plant generating green hydrogen.”valve-world.net
Summarized from public sources; check the original articles before acting on it.