Loading…
BHEL has secured an order from Mahan Energen Limited (Adani Power subsidiary) to supply boiler, turbine, and generator for a 2x800 MW supercritical power project in Bandhaura, Madhya Pradesh. The order is valued at approximately Rs. 4,000 crore ($480 million).
“BHEL has secured an order from Mahan Energen Limited, a subsidiary of Adani Power Limited, to supply equipment including Boiler, Turbine, and Generator.”projectxindia.com
Summarized from public sources; check the original articles before acting on it.