Loading…

Zeppelin Power Systems will equip Stadtwerke Duisburg with a 9 MW large heat pump as an innovative CHP plant, connected to the wastewater treatment plant of Wirtschaftsbetriebe Duisburg. The plant will provide heat to 4,000 households and is expected to start operation in spring 2025.
“Die Anlage soll im Frühjahr 2025 in Betrieb gehen.”stadt-und-werk.de
Summarized from public sources; check the original articles before acting on it.