Loading…

UFlex commissioned a new facility in Dharwad, Karnataka, in March 2023. The plant has a 10.6-meter BOPET line with annual capacity of 45,000 metric tonnes and a six-meter CPP line with capacity of 18,000 tonnes per year.
“The Dharwad plant was commissioned in March 2023 and has a state-of-the-art 10.6-meter BOPET line, capable of yielding an annual output of 45,000 metric tonnes.”thepackman.in
Summarized from public sources; check the original articles before acting on it.