Loading…
Sulzer will supply two MD200-400 feedwater pumps for the 840 MW Keadby 2 combined cycle gas turbine plant in Lincolnshire, built by SSE with Siemens turbines, scheduled to start operation in 2022.
“The plant will use two of Sulzer's state-of-the-art feedwater pumps, MD200-400, which have been upgraded in close collaboration with leading gas turbine manufacturers, including Siemens.”empoweringpumps.com
Summarized from public sources; check the original articles before acting on it.