Loading…

Mitsubishi Heavy Industries will acquire a 50.1% stake in Kırklareligaz, an asset of Ata Elektrik, to form a joint venture and build a 520 MW gas-fired power plant in Kırklareli, Turkey. The plant is scheduled to be operational by 2016.
“The Japanese side will take over a 50.1 percent stake in Kirklareligaz, an asset of Ata Elektrik, to form a JV and build a gas-fired power plant.”invest.gov.tr
Summarized from public sources; check the original articles before acting on it.