Loading…

Kongshavn Industri AS received a comprehensive order from Aker Solutions to produce the TOGI PLT (Troll-Oseberg gas injection Pull in Tool), including subsea tools, a porch structure, and test facilities. The project will be completed in May 2024, with the PLT ready for the summer campaign 2024.
“Kongshavn Industri are proud to take part in this project.”kongshavnindustri.no
Summarized from public sources; check the original articles before acting on it.