Loading…
Equinor has awarded a Front-End Engineering Design (FEED) contract for the H2H Saltend low carbon hydrogen production plant to Linde Engineering, and an operation and maintenance service contract to BOC. The 600-megawatt plant with carbon capture is due to be operational by 2027.
“Equinor has awarded a Front-End Engineering Design (FEED) contract for H2H Saltend to Linde Engineering, and an operation and maintenance service contract to BOC.”equinor.com
Summarized from public sources; check the original articles before acting on it.