Loading…

Norfolk Southern Railway is installing six fully electric cranes manufactured by Kuenz Cranes at its Austell, Georgia, intermodal terminal, converting part of the facility to stacked-container operations. The $21 million project will double throughput to 100,000 containers annually and is expected to be completed by the end of 2023.
“Adding the cranes will turn the Austell site into a partial stacked-container facility, which will help double throughput to 100,000 containers annually.”progressiverailroading.com
Summarized from public sources; check the original articles before acting on it.