Loading…

Mehler Engineered Products began construction in October 2021 on a new production hall with a hybrid finishing line for technical threads at its German plant in Hessisch Lichtenau. Trial operation is scheduled to start in April 2023.
“The first trial operation will start after final commissioning of the plant in April 2023.”mehler-ep.com
Summarized from public sources; check the original articles before acting on it.