Loading…
Cavendish Nuclear has won a circa £20 million contract to design, manufacture, install and commission a Drum Handling Facility at Dounreay to package intermediate level waste, over a five-year timeframe.
“Cavendish Nuclear has been awarded a circa £20 million contract that will provide Dounreay with the capability to package solid Intermediate Level Waste (ILW) from the Dounreay Shaft and Silo.”babcockinternational.com
Summarized from public sources; check the original articles before acting on it.