Loading…
TBEA's subsidiary Xinjiang Tianchi Energy won a bid and signed an agreement with Bazhou government to build a 2×350 MW coal-fired combined heat and power plant in Ruoqiang County, Xinjiang, with a total investment of 3.015 billion yuan.
“该项目总投资30.15亿元,建设工期18个月。”beta.zhitongcaijing.com
Summarized from public sources; check the original articles before acting on it.