Loading…

G&G Steel Inc. was awarded an $11,707,681 contract modification for fabrication of miter gate assemblies for two upper Mississippi River locks and dams. Work will be performed in Russellville, Alabama, with completion by Sept. 30, 2026.
“G&G Steel Inc., Russellville, Alabama, was awarded an $11,707,681 modification ... for the fabrication of miter gate assemblies.”defensedaily.com
Summarized from public sources; check the original articles before acting on it.