Loading…

Advansor has taken over a new 5,000 sqm factory hall in Aarhus, Denmark, tripling its production capacity for CO2-based cooling and heat pump systems, including large heat pumps up to 10 MW.
“I den nye 5.000 m2 store fabrikshal skal der blandt andet produceres varmepumper op til 10 MW”electronic-supply.dk
Summarized from public sources; check the original articles before acting on it.