Loading…
SÜLZLE KLEIN was awarded a contract to supply and commission a mechanical sludge thickening system in a container for the Erftstadt/Köttingen wastewater treatment plant, which was damaged in the 2021 flood. The system was accepted on September 14, 2022.
“For the excess sludge thickening, SÜLZLE Klein GMBH was awarded the contract for the delivery and commissioning of a mechanical sludge thickening system including peripherals in a container in December 2021.”suelzle-klein.de
Summarized from public sources; check the original articles before acting on it.