Loading…
LIBERTY Ostrava signed a contract with Danieli for two hybrid electric arc furnaces, part of a CZK 8.6 billion (EUR 350 million) investment to reduce emissions by over 80% by 2027. The furnaces are expected to be operational in 2025.
“The new furnaces, the first of their kind in Europe, will have a combined capacity of 3.5 million tonnes per annum.”libertysteelgroup.com
Summarized from public sources; check the original articles before acting on it.