Loading…
SSE Thermal and Equinor selected a consortium of Aker Solutions, Siemens Energy and Doosan Babcock, with Aker Carbon Capture as provider, for the FEED contract of the Keadby 3 Carbon Capture Power Station in the Humber region, UK. The plant would have up to 910 MW capacity and capture up to 1.5 MT of CO2 annually.
“The consortium has been awarded the FEED contract for the gas-to-power plant equipped with carbon capture technology to be built in the Humber region.”prnewswire.com
Summarized from public sources; check the original articles before acting on it.