Loading…

Unil commissioned Swisslog to more than double the size of its automated high-bay warehouse in Våler, Norway. The expansion includes 16 new Vectura stacker cranes and conveyor system, adding 105,500 pallet locations. The total budget is US$ 41.82 million. The new crane warehouse was ready summer 2022, with full automation operation planned for mid-2023.
“The new warehouse gives us a competitive advantage because it gives us a low handling cost and fast and reliable pallet handling.”logisticsgulfnews.com
Summarized from public sources; check the original articles before acting on it.