Loading…

Anodyne Electronics Manufacturing Corp. (AEM) moved operations to a newly constructed 35,000-square-foot facility in Kelowna, British Columbia, increasing production capacity by 10,000 square feet.
“The brand-new purpose-built facility, which was announced in 2020, has been designed for increased operational efficiency.”aem-corp.com
Summarized from public sources; check the original articles before acting on it.