Loading…

Fabweld Steel Products secured orders worth over £346,000 for bespoke cable brackets used in the London Power Tunnels 2 project, a 32.5 km underground cable tunnel network in south London. The project is part of a £750m investment by National Grid.
“We are delighted to have a continuing role in this significant overhaul of London’s power supply.”fsp.co.uk
Summarized from public sources; check the original articles before acting on it.