Loading…

Abengoa, in consortium with SEPCOIII, achieved first permeate at the Taweelah desalination plant in Abu Dhabi, with a capacity of 909,000 m³/day, three months ahead of schedule.
“Abengoa has started producing drinking water at the Taweelah desalination plant in record time, three months ahead of schedule.”saudigulfprojects.com
Summarized from public sources; check the original articles before acting on it.