Loading…
Sinosteel International's subsidiary Sinosteel Equipment and Sinosteel Engineering Design signed a $1.096 billion EPC contract with Tosyali Algeria for a new integrated steel plant project, including DRI, steelmaking and hot rolling. Construction periods: 30 months for DRI, 24 months for steelmaking and hot rolling.
“中钢设备有限公司及其全资子公司中钢集团工程设计研究院有限公司与Tosyali阿尔及利亚钢铁工业公司于2021年12月1日签署了新建Tosyali阿尔及利亚四期综合钢厂项目EPC总承包合同,包括直接还原铁、炼钢和热连轧三个部分,合同金额总计10.96亿美元。”beta.zhitongcaijing.com
Summarized from public sources; check the original articles before acting on it.