Loading…

Steel Dynamics will build a 390,000-square-foot building with a new paint line and a second galvanizing line at its plant in Vigo County Industrial Park, Terre Haute. The project costs about $34.65 million for the building and $196.35 million for equipment, creating over 80 jobs.
“The new building is slated to be 1,600 feet long and 180 feet wide, containing a new paint line and a second galvanizing line, each slated to go into operation in 2023.”tribstar.com
Summarized from public sources; check the original articles before acting on it.