Loading…
OAO MILKOM is constructing a local wastewater treatment system at its Sarapul-moloko production facility in Udmurtia, Russia, with a capacity of 1,000 cubic meters per day. The project is part of the MILKOM-2020 investment contract and is expected to start operations in April 2022.
“Запуск ЛОС в промышленную эксплуатацию планируется в апреле 2022 года.”komos.ru
Summarized from public sources; check the original articles before acting on it.