Loading…
Vestas secured a 207 MW order from Duke Energy Sustainable Solutions for the Ledyard Windpower project in Iowa, USA. The order includes 46 V150-4.5 MW turbines, supply, commissioning, and a 10-year service agreement. Delivery begins Q2 2022, commissioning in Q4 2022.
“Vestas has secured a 207 MW order from Duke Energy Sustainable Solutions to power the Ledyard Windpower project in Iowa, USA, featuring 46 V150-4.5 MW wind turbines.”windtech-international.com
Summarized from public sources; check the original articles before acting on it.