Loading…
Tongyu Heavy Industry's subsidiary Qingdao Baojian Technology Engineering will invest 667 million yuan to build a large offshore wind power product capacity enhancement project at its existing plant in Jimo, Qingdao. The project will add annual capacity of 360 sets of large offshore wind power structural parts and machining capability, with a one-year construction period.
“项目建成后预计将形成年产360套大型海上风电结构件的生产能力,以及配套机加工能力。”beta.zhitongcaijing.com
Summarized from public sources; check the original articles before acting on it.