Loading…

Mitsubishi Power received an order to supply a 180 MW class blast furnace gas-fired GTCC power plant for Jiangsu Shagang Group in China, with operation scheduled to commence in 2023.
“Mitsubishi Power has received an order to supply a 180 megawatt (MW) class gas turbine combined cycle (GTCC) power plant fired by blast furnace gas (BFG) for Jiangsu Shagang Group.”power.mhi.com
Summarized from public sources; check the original articles before acting on it.