Loading…
SBM Mineral Processing GmbH was awarded an exclusive contract by Femern Link Contractors (FLC) to supply six concrete mixing plants for the world's longest immersed tunnel, the Fehmarn Belt Fixed Link. The contract includes delivery of one EUROMIX 3300 SPACE in 2021 and five LINEMIX 4500 CM plants, with Factory A starting in mid-2022.
“SBM Mineral Processing GmbH is pleased to announce that following commencement of the project, Femern Link Contractors (FLC) has subsequently awarded the exclusive supply of concrete mixing plants to SBM Mineral Processing”concretonline.com
Summarized from public sources; check the original articles before acting on it.