Loading…

Boom Logistics was awarded a contract at the Snowy 2.0 hydroelectric project in Australia to supply a 750-tonne and 350-tonne crawler crane plus crew to support tunnel boring machine installation. Work commenced in August 2020.
“Boom announced that it has been awarded a new contract at the Snowy 2.0 project to supply a 750 tonne and 350 tonne crawler plus crew to support the installation of the tunnel boring machines, which commenced in August 2020.”boomlogistics.com.au
Summarized from public sources; check the original articles before acting on it.