Loading…

APR Energy secured a contract with California's Imperial Irrigation District to provide three gas turbines for distributed generation capacity over three sites during the 2021 summer months. The solution is expected to become operational in June 2021.
“APR's fast-track power solution will assist in maintaining frequency and provide needed backup capacity within IID's service territory.”newswire.ca
Summarized from public sources; check the original articles before acting on it.