Loading…

Bahrain's Works Ministry completed concrete restoration works of the aeration basins at the Tubli wastewater plant, costing BD 1,620,308. The project strengthened structures and increased plant capacity.
“the BD 1,620,308 restoration works contributed to strengthening the concrete structures and raise the plants capacity to deal with the increased flow of wastewater.”newsofbahrain.com
Summarized from public sources; check the original articles before acting on it.