Loading…

Sener and MMEC Mannesmann (MMYPEM) have been awarded a turnkey EPC contract by Uniper Kraftwerke GmbH for a gas cogeneration plant at the Scholven/Gelsenkirchen thermal power plant. MMYPEM's scope includes assembly of two Siemens SGT-800 gas turbines and one SST-300 steam turbine.
“MMYPEM‘s scope consists of the assembly of two gas turbines model SGT-800 and one steam turbine model SST-300, both SIEMENS with their corresponding generators.”mmypem.com
Summarized from public sources; check the original articles before acting on it.