Loading…
Auer Packaging added a third production hall with 3,000 square meters of manufacturing space and nine new injection molding machines at its Amerang site in Bavaria. Four of the machines are expected to start up soon.
“Mit der neuen, dritten Produktionshalle verfügen wir über zusätzliche 3.000 Quadratmeter Fertigungsfläche und neun neue, leistungsstarke Spritzgussanlagen.”packaging-journal.de
Summarized from public sources; check the original articles before acting on it.