Loading…

WEG Transformers USA has purchased a third location in Washington, Missouri for a $16.5 million manufacturing expansion. The 147,000 sq. ft facility will be dedicated to three-phase utility pad-mounted distribution transformers, with pilot production expected in Q3 2021.
“WEG has purchased a third location in Washington, MO for a $16.5 million manufacturing expansion.”weg.us
Summarized from public sources; check the original articles before acting on it.