Loading…
Azomures signed a contract with E.ON Energie Romania for a turnkey power plant using residual steam, with a 2.65 MW capacity, costing €4 million, scheduled to start in the first part of 2022.
“We continue to invest in modern technologies to prepare the platform for a sustainable future.”ameropa.com
Summarized from public sources; check the original articles before acting on it.