Loading…

Esmil supplied and installed 984 meters of tube air diffusers for the third stage of a new municipal wastewater treatment plant in Zhaodong, China, with a capacity of 30,000 m³/day, which was put into operation in October 2020.
“In October 2020, Esmil Tube Air Diffusers were installed and put into operation at the municipal wastewater treatment plant in Zhaodong, China.”esmil.eu
Summarized from public sources; check the original articles before acting on it.