Loading…
Cosmo Films installed a new 10.4-metre BOPP line at its existing Karjan facility near Vadodara, Gujarat, raising annual capacity 40 percent to 196,000 MT. The line cost about Rs 200 crore and was commissioned ahead of schedule.
“we have installed the line ahead of its schedule and well within the projected capex of Rs 200 crore.”india.com
Summarized from public sources; check the original articles before acting on it.