Loading…
Mitsubishi Power has received an order for two sets of flue gas desulfurization systems for the Nikola Tesla B coal-fired power plant in Serbia, each with 670 MW capacity, with operation scheduled to start in 2024.
“Mitsubishi Power, a subsidiary of Mitsubishi Heavy Industries (MHI) Group, has received an order for two sets of one of the world’s largest flue gas desulfurization (FGD) systems for the Nikola Tesla B coal-fired power plant in Serbia.”powermag.com
Summarized from public sources; check the original articles before acting on it.