Loading…
TBEA Co., Ltd. is investing about $240 million in a green energy industrial park in Vadodara, Gujarat, India, covering 43.88 hectares, to manufacture power transmission and renewable energy equipment. Phase 1 (2012-2020) is operational with 2,000 MVA annual capacity; Phase 2 and 3 are planned.
“特变电工绿色能源产业园目前占地 43.88万平方米,总投资约 2.4亿美元。”acfic.org.cn
Summarized from public sources; check the original articles before acting on it.