Loading…

Doosan Škoda Power has been selected to supply and install a 67 MW steam turbine and auxiliaries for the Rookery South Energy Recovery Facility in the UK. The turbine has been shipped from the Czech Republic.
“We have been working with Doosan Skoda Power on several projects before and we are looking forward to being able to rely on their expertise again in this important infrastructure project in the UK.”bioenergyinternational.com
Summarized from public sources; check the original articles before acting on it.