Loading…

A consortium led by Hochtief Infrastructure GmbH was awarded the contract to build a cable-stayed bridge over the Rhine at Duisburg, with the requirement that 33,000 tonnes of steel be sourced in Germany. The project is valued at €500 million and is planned for completion in late 2026.
“The 33,000 tonnes of steel for the bridge will be sourced in Germany, to be fabricated in Germany, Hungary and the Czech Republic.”eurometal.net
Summarized from public sources; check the original articles before acting on it.