Loading…
Sinopec Yizheng Chemical Fiber started up a 500-tonne-per-year meltblown fabric production line on March 29, 2020, after 35 days of construction. The line has over 95% domestic equipment, and 16 lines are expected to be fully operational by May 2020.
“该项目国产化率达95%以上,把常规一年的建设周期压缩成一个多月,跑出了中国制造的加速度。”workercn.cn
Summarized from public sources; check the original articles before acting on it.