Loading…
Hoban TBM was awarded a KRW 102.9 billion contract for the Gripper TBM construction of Section 5 of the GTX-A railway line in Seoul, South Korea, covering a 4.4 km tunnel between Yeonsinnae and Seoul Station.
“호반TBM이 수도권광역급행철도(GTX) A노선 5공구의 ‘그리퍼(Gripper) TBM’ 건설공사를 수주했다고 20일 밝혔다.”biz.heraldcorp.com
Summarized from public sources; check the original articles before acting on it.