Loading…

PGE has chosen GE and Polimex-Mostostal to build two gas-steam blocks at the Dolna Odra power station in Poland. The investment is valued at PLN 3.7 billion net, with commissioning expected in December 2023.
“PGE expects the commissioning of new units to take place in December 2023.”polanddaily24.com
Summarized from public sources; check the original articles before acting on it.