Loading…

Gree Electric's second-phase large central air-conditioning project in Changsha, China, officially started production on November 19, 2019, with an annual design capacity of 50,000 units. The third-phase refrigerator and washing machine production base also broke ground, with an annual design capacity of 4.5 million units.
“本次下线产品是获得“国际领先”认证的格力磁悬浮离心式冷水机组”news.cnstock.com
Summarized from public sources; check the original articles before acting on it.