Loading…

ABB supplied and installed a Compact HMI SCADA system for British Cables Company in Manchester, replacing controls on two cable-making lines, increasing production by 29% and reducing energy costs by £16,000 per year.
“An ABB control system is increasing productivity, lowering waste and reducing energy costs for UK cable manufacturer.”factoryandhandlingsolutions.co.uk
Summarized from public sources; check the original articles before acting on it.